# Task AR.2 Implementation Report - 2026-07-07 ## Scope - start and complete AR.2 as a documentation-only epic and technical-design phase - review AR.1, BU-R blueprint/audit, current CRM foundations, current UI patterns, and workspace UI governance - produce an implementation-ready epic baseline and a required workspace UI/UX design note ## What Was Produced - epic and technical design baseline: [task-ar.2-epic-technical-design-2026-07-07.md](/C:/Users/mtpphtaps/Documents/gitea/alla-allaos-fullstack/docs/implementation/task-ar.2-epic-technical-design-2026-07-07.md) - workspace UI/UX design note: [task-ar.2-workspace-ui-ux-design-note-2026-07-07.md](/C:/Users/mtpphtaps/Documents/gitea/alla-allaos-fullstack/docs/implementation/task-ar.2-workspace-ui-ux-design-note-2026-07-07.md) ## Key Decisions Captured 1. AR.2 freezes the implementation sequence from foundational runtime to projection layer to workspace layer. 2. Activity Platform and Business Event Expansion are the first delivery epics because they unblock most downstream work. 3. Customer Workspace is the first major visible workspace because it extends the strongest existing production base. 4. Calendar, My Day, Manager, Executive, and major Activity surfaces require an approved UI/UX design note before code starts. 5. Business-role workspaces must stay under `/dashboard/crm/*` and must not reuse the existing admin `workspaces` route. ## Verification - Documentation-only change. - No schema, API, UI, service, permission, or runtime business-logic files were changed. - No build or test command was required for this phase. ## Outcome AR.2 now records both the implementation-ready epic/technical-design baseline and the approved workspace UI/UX baseline needed before future implementation work begins.