# Task EP.1.6.2 - Direct Big Calendar UI Adoption Date: 2026-07-13 Status: Foundation Implemented Upstream reviewed: `lramos33/big-calendar` Upstream commit: `fbb8485e3d54b267261056c784632229ba6f7bc3` License: MIT, upstream concepts retained with local ALLA OS adaptation. ## Summary EP.1.6.2 replaces the CRM calendar workspace's custom tab/grid renderer with a local Big Calendar layer adapted from the upstream component architecture. The implementation preserves ALLA OS backend ownership: Activity, Business Events, Calendar Projection, Projection Runtime, permissions, and API contracts remain unchanged. The UI now flows through: ```text CalendarProjectionItem -> mapCalendarProjectionToBigCalendarEvent() -> BigCalendarProvider -> BigCalendarHeader -> Day / Week / Month / Agenda views -> Activity reschedule command ``` ## Adopted Components And Concepts - Added `src/features/crm/calendar/big-calendar/provider.tsx` for local calendar state, selected date, selected view, user filter, drag state, working hours, and Activity command dispatch. - Added `src/features/crm/calendar/big-calendar/header.tsx` for upstream-style Today, previous, next, range display, user filter, and view switching. - Added `src/features/crm/calendar/big-calendar/views.tsx` for Day, Week, Month, and Agenda rendering. - Added `src/features/crm/calendar/big-calendar/calendar-slot.tsx` for calendar slots, empty overlays, and HTML5 drop handling. - Added `src/features/crm/calendar/big-calendar/event-card.tsx` for draggable event cards and resize command affordance. - Added `src/features/crm/calendar/big-calendar/helpers.ts` and `types.ts` for local view, slot, date range, and command contracts. - Updated `src/features/crm/calendar/components/calendar-workspace.tsx` to use the Big Calendar provider/header/views instead of local custom renderers. - Updated `src/features/crm/calendar/components/calendar-adapter.ts` with `mapBigCalendarActionToActivityCommand()`. - Extended `BigCalendarEvent.source` with `ownerId` and `assigneeId` so the provider can support user filtering without reading database rows. ## Rejected Upstream Demo Code - Did not import the upstream app shell, demo stores, or mock data ownership. - Did not add React Hook Form; this repository forbids new RHF usage. - Did not add upstream persistence or direct database reads. - Did not mutate `crm_calendar_projection` rows from UI interactions. - Did not replace the Activity API or Business Event flow. ## Interaction Behavior - Editable Activity events can emit reschedule commands through `rescheduleActivity()`. - Drag/drop maps a dropped editable Activity to an Activity reschedule request. - Resize currently uses a command-based duration extension affordance rather than full upstream edge-resize parity. - Read-only milestones do not emit Activity commands. - After successful reschedule, Calendar, Activity, and My Day query groups are invalidated. - Day, Week, and Month retain EP.1.6.1 behavior by always rendering grid slots, including empty states. - Agenda keeps list-style empty behavior. ## Upgrade Strategy Future upstream sync should compare against commit `fbb8485e3d54b267261056c784632229ba6f7bc3`, then port only rendering and interaction improvements into `src/features/crm/calendar/big-calendar/**`. Keep ALLA OS adapter and command boundaries stable. Full upstream parity still requires a deliberate dependency review for `react-dnd`, upstream resize behavior, and any accessibility changes before adding them to this Next.js 16 / React 19 / shadcn / TanStack stack. ## Verification - Passed: `npm run typecheck` - Passed: `npx oxlint src/features/crm/calendar` - Not run: `npm run db:generate` because EP.1.6.2 made no schema changes. - Not automated: browser drag/drop, resize, responsive, and screen-reader regression checks.