Task AR.2 Implementation Report - 2026-07-07
Scope
- start and complete AR.2 as a documentation-only epic and technical-design phase
- review AR.1, BU-R blueprint/audit, current CRM foundations, current UI patterns, and workspace UI governance
- produce an implementation-ready epic baseline and a required workspace UI/UX design note
What Was Produced
- epic and technical design baseline: task-ar.2-epic-technical-design-2026-07-07.md
- workspace UI/UX design note: task-ar.2-workspace-ui-ux-design-note-2026-07-07.md
Key Decisions Captured
- AR.2 freezes the implementation sequence from foundational runtime to projection layer to workspace layer.
- Activity Platform and Business Event Expansion are the first delivery epics because they unblock most downstream work.
- Customer Workspace is the first major visible workspace because it extends the strongest existing production base.
- Calendar, My Day, Manager, Executive, and major Activity surfaces require an approved UI/UX design note before code starts.
- Business-role workspaces must stay under
/dashboard/crm/*and must not reuse the existing adminworkspacesroute.
Verification
- Documentation-only change.
- No schema, API, UI, service, permission, or runtime business-logic files were changed.
- No build or test command was required for this phase.
Outcome
AR.2 now records both the implementation-ready epic/technical-design baseline and the approved workspace UI/UX baseline needed before future implementation work begins.