# EP.1.2 – Activity Integration & Legacy Follow-up Adapter
|
||
|
||
Status: Completed
|
||
|
||
Priority: Critical
|
||
|
||
Type: Feature Integration
|
||
|
||
Depends On
|
||
|
||
- EP.1.1 Activity Domain Foundation
|
||
- ENG.0 Engineering Constitution
|
||
- AR.1 Architecture Transition Plan
|
||
- AR.2 Epic Technical Design
|
||
|
||
---
|
||
|
||
# Objective
|
||
|
||
Introduce the Activity Integration Layer that connects the new Activity Domain with existing CRM modules while preserving all legacy follow-up implementations.
|
||
|
||
This phase establishes adapter-based integration without introducing data migration, dual-write, or projection consumers.
|
||
|
||
The objective is to prepare existing modules to consume Activity incrementally while maintaining production stability.
|
||
|
||
---
|
||
|
||
# Background
|
||
|
||
EP.1.1 introduced the additive `crm_activities` write model.
|
||
|
||
Current CRM still contains multiple follow-up implementations:
|
||
|
||
- Lead (audit-log-backed)
|
||
- Opportunity (row-backed)
|
||
- Quotation (row-backed)
|
||
|
||
Business Constitution defines Activity as the long-term operational model.
|
||
|
||
Architecture Constitution requires:
|
||
|
||
- Preserve existing production behavior.
|
||
- Introduce Activity through adapters.
|
||
- Delay consolidation until adapters are validated.
|
||
|
||
---
|
||
|
||
# Review Required
|
||
|
||
Review
|
||
|
||
Business
|
||
|
||
- Relationship & Sales Workspace Blueprint
|
||
- Activity Blueprint
|
||
|
||
Architecture
|
||
|
||
- AR.1 Architecture Transition Plan
|
||
- AR.2 Epic Technical Design
|
||
|
||
Engineering
|
||
|
||
- Engineering Constitution
|
||
|
||
Implementation
|
||
|
||
- EP.1.1 Activity Foundation
|
||
- Existing Lead Follow-up
|
||
- Existing Opportunity Follow-up
|
||
- Existing Quotation Follow-up
|
||
- Existing Dashboard queries
|
||
- Existing Reports
|
||
- Existing Audit Log
|
||
|
||
UI
|
||
|
||
- Workspace UI/UX Design Note
|
||
- layout.md
|
||
- ui-ux-rules.md
|
||
- ui-ux-pro-max
|
||
|
||
---
|
||
|
||
# Scope
|
||
|
||
## Part 1 — Legacy Follow-up Adapter Layer
|
||
|
||
Introduce adapter interfaces.
|
||
|
||
Create
|
||
|
||
LeadFollowUpAdapter
|
||
|
||
OpportunityFollowUpAdapter
|
||
|
||
QuotationFollowUpAdapter
|
||
|
||
Responsibilities
|
||
|
||
Read legacy follow-up
|
||
|
||
Translate legacy model
|
||
|
||
Produce Activity-compatible DTO
|
||
|
||
No database migration.
|
||
|
||
No dual write.
|
||
|
||
---
|
||
|
||
## Part 2 — Activity Context Integration
|
||
|
||
Integrate Activity with
|
||
|
||
Customer
|
||
|
||
Contact
|
||
|
||
Lead
|
||
|
||
Opportunity
|
||
|
||
Quotation
|
||
|
||
PO
|
||
|
||
Activity must resolve context without changing ownership of those domains.
|
||
|
||
---
|
||
|
||
## Part 3 — Activity Type Governance
|
||
|
||
Freeze the official activity catalog.
|
||
|
||
Minimum types
|
||
|
||
- Meeting
|
||
- Visit
|
||
- Phone Call
|
||
- Email
|
||
- Site Survey
|
||
- Presentation
|
||
- Reminder
|
||
- Internal Task
|
||
- Follow-up
|
||
- Delivery Coordination
|
||
- Approval Action
|
||
|
||
Introduce `crm_activity_type` master options.
|
||
|
||
No hard-coded types.
|
||
|
||
---
|
||
|
||
## Part 4 — Activity Context Strategy
|
||
|
||
Freeze
|
||
|
||
contextType
|
||
|
||
contextId
|
||
|
||
supported contexts
|
||
|
||
Exactly one primary context.
|
||
|
||
Optional related references.
|
||
|
||
Prepare Timeline and Calendar compatibility.
|
||
|
||
---
|
||
|
||
## Part 5 — Activity Number Strategy
|
||
|
||
Introduce configurable document numbering.
|
||
|
||
Example
|
||
|
||
ACT2607-0001
|
||
|
||
Support
|
||
|
||
Organization
|
||
|
||
Branch
|
||
|
||
Period
|
||
|
||
Sequence
|
||
|
||
Reuse existing Document Sequence Foundation.
|
||
|
||
---
|
||
|
||
## Part 6 — Activity Attachment Foundation
|
||
|
||
Integrate Activity with existing Storage Foundation.
|
||
|
||
Support
|
||
|
||
Images
|
||
|
||
PDF
|
||
|
||
Office Documents
|
||
|
||
Voice Recording
|
||
|
||
Drawing
|
||
|
||
No new storage engine.
|
||
|
||
Reuse current abstraction.
|
||
|
||
---
|
||
|
||
## Part 7 — Activity UI Integration
|
||
|
||
Extend existing pages.
|
||
|
||
Customer Detail
|
||
|
||
Opportunity Detail
|
||
|
||
Quotation Detail
|
||
|
||
Lead Detail
|
||
|
||
Add
|
||
|
||
Recent Activities
|
||
|
||
Create Activity
|
||
|
||
Activity Summary
|
||
|
||
Do NOT replace Follow-up UI.
|
||
|
||
Run both in parallel.
|
||
|
||
---
|
||
|
||
## Part 8 — Permission Integration
|
||
|
||
Reuse existing CRM permission model.
|
||
|
||
Support
|
||
|
||
Owner
|
||
|
||
Assignee
|
||
|
||
Manager
|
||
|
||
Administrator
|
||
|
||
Organization
|
||
|
||
Branch
|
||
|
||
Product Type
|
||
|
||
Pricing visibility
|
||
|
||
Internal-only Activity
|
||
|
||
---
|
||
|
||
## Part 9 — Compatibility Layer
|
||
|
||
Introduce compatibility interfaces.
|
||
|
||
Legacy Follow-up
|
||
|
||
↓
|
||
|
||
Activity Adapter
|
||
|
||
↓
|
||
|
||
Activity DTO
|
||
|
||
Current consumers remain unchanged.
|
||
|
||
No existing API removed.
|
||
|
||
No schema migration.
|
||
|
||
---
|
||
|
||
## Part 10 — Migration Readiness
|
||
|
||
Produce
|
||
|
||
Adapter validation
|
||
|
||
Compatibility report
|
||
|
||
Legacy usage inventory
|
||
|
||
Projection readiness report
|
||
|
||
Migration checklist
|
||
|
||
No migration execution.
|
||
|
||
---
|
||
|
||
# Deliverables
|
||
|
||
1. Lead Follow-up Adapter
|
||
2. Opportunity Follow-up Adapter
|
||
3. Quotation Follow-up Adapter
|
||
4. Activity Context Integration
|
||
5. Activity Type Governance
|
||
6. Activity Numbering Strategy
|
||
7. Activity Attachment Foundation
|
||
8. Activity UI Integration
|
||
9. Compatibility Layer
|
||
10. Migration Readiness Report
|
||
|
||
---
|
||
|
||
# Constraints
|
||
|
||
Must preserve
|
||
|
||
- Existing Follow-up
|
||
- Existing APIs
|
||
- Existing Reports
|
||
- Existing Dashboard
|
||
- Existing Audit History
|
||
- Existing Permissions
|
||
|
||
No Timeline.
|
||
|
||
No Calendar.
|
||
|
||
No Notification.
|
||
|
||
No My Day.
|
||
|
||
No Dashboard Projection.
|
||
|
||
No Event Publishing.
|
||
|
||
No data migration.
|
||
|
||
No dual write.
|
||
|
||
---
|
||
|
||
# Acceptance Criteria
|
||
|
||
- Activity integrates with all major CRM modules.
|
||
- Existing Follow-up continues to function.
|
||
- Adapter Layer becomes the only integration point.
|
||
- Activity Types are centrally governed.
|
||
- Activity Numbering follows Document Sequence Foundation.
|
||
- Activity Attachments reuse existing Storage Foundation.
|
||
- No production behavior changes.
|
||
- No breaking API changes.
|
||
- No duplicated business logic.
|
||
- No duplicated lifecycle.
|
||
|
||
---
|
||
|
||
# Success Criteria
|
||
|
||
Activity is fully integrated into the CRM foundation.
|
||
|
||
Legacy Follow-up remains operational.
|
||
|
||
All future projection epics can consume Activity through stable interfaces.
|
||
|
||
Repository remains backward compatible.
|
||
|
||
Ready for
|
||
|
||
EP.1.3 – Business Event Foundation & Projection Contracts.
|