1.8 KiB
1.8 KiB
Task AR.1 Implementation Report - 2026-07-07
Scope
- start and complete AR.1 as a documentation-only architecture transition phase
- review the frozen BU-R business baseline, current production CRM implementation, reusable foundations, ADRs, security boundaries, and transition seams
- record the official transition architecture baseline for later AR.2 epics and technical design
What Was Produced
- created the main AR.1 transition architecture artifact: task-ar.1-architecture-transition-plan-2026-07-07.md
Key Decisions Captured
- Current production CRM domains remain the write owners and must be preserved.
- New capability should arrive as:
- shared
Activitydomain - generated
Timelineprojection - generated
Calendarprojection - role-oriented CRM workspaces
- shared
- Existing admin
/dashboard/workspacesroutes are preserved for organization administration and must not be silently reused for business-role workspace navigation. Approvalstays the document workflow owner,Opportunitystays the business outcome owner, andQuotationstays the document lifecycle owner.- Notification expansion, My Day, Manager Workspace, and Executive Workspace must build on event/projection layers rather than creating duplicate lifecycle stores.
Verification
- Documentation-only change.
- No schema, API, UI, service, permission, or business-logic runtime change was made.
- No build or test command was required for this phase.
Outcome
AR.1 is now recorded as the architecture transition baseline that future epics can reference for preserve/extend/refactor decisions, event design, projection strategy, workspace routing, dependency analysis, and implementation ordering.